top of page

What Insolvency Risk Clauses Should Vendor Contracts Include

Writer: Vikrant D. Shetty
Vikrant D. Shetty
5 days ago
16 min read
What Insolvency Risk Clauses Should Vendor Contracts Include

A standard termination-for-insolvency clause in an Indian vendor contract is the least reliable protection available, because the Supreme Court held in Gujarat Urja Vikas Nigam Ltd. v. Amit Gupta that the National Company Law Tribunal can restrain termination under Section 60(5)(c) of the Insolvency and Bankruptcy Code, 2016 where the only ground is the commencement of insolvency and the contract is central to the corporate debtor's survival. Reliable protection instead comes from information covenants, on-demand credit support, title retention exercised before admission, and a dispute clause designed to crystallise a claim quickly. This article covers the clauses that continue to work once a corporate insolvency resolution process begins.


The Clause Everyone Drafts and Nobody Can Enforce

In Gujarat Urja Vikas Nigam Ltd. v. Amit Gupta [(2021) 7 SCC 209] the Supreme Court restrained termination of a power purchase agreement where the only ground was the commencement of insolvency, holding that the National Company Law Tribunal (NCLT) could act under section 60(5)(c) of the Insolvency and Bankruptcy Code, 2016 (the Code) to prevent a termination that would extinguish the corporate debtor's sole revenue stream. The Court declined to read a general bar on ipso facto clauses into the Code, so outcomes remain fact-sensitive, but no drafter should build a supply continuity plan around a termination-on-insolvency right.


The clause still earns its place. It works before admission, where a winding up petition, an out-of-court restructuring under Reserve Bank of India frameworks, or a foreign insolvency filing may not attract section 14 of the Code at all. Treat it as a trigger definition rather than a remedy, and put the protection elsewhere.


Information Covenants: The Cheapest Protection Available

Everything else here depends on knowing early. An obligation to deliver information costs the buyer nothing, and a vendor has little reason to refuse it at onboarding, when bargaining power is at its highest and the vendor is not yet in trouble.


Periodic accounts and the director's covenant certificate

Above a defined exposure threshold, require audited financial statements within a fixed number of days of the financial year end and unaudited management accounts each half year. Add a short certificate signed by a director confirming that the vendor can pay its debts as they fall due, that no event of default subsists under its financing documents, and that no application under section 7 or section 9 of the Code has been filed or threatened. The certificate matters more than the accounts, because it creates a personal cost to concealment and a dated record.


A notification duty tied to named credit events

Draft a positive obligation to notify within a short fixed period, three business days being realistic, on a closed list of credit events: a downgrade or withdrawal of any credit rating; receipt of a demand notice under section 8 of the Code; the filing of any application under section 7, 9 or 10; an application under section 95 against a promoter who has guaranteed the vendor's borrowings; creation of a new charge over the vendor's assets; any default under a financing document; resignation of the statutory auditor; and dishonour of any instrument above a stated value. Attach a right to suspend further orders and call for security, and make failure to notify a material breach in its own right.


Credit Support: What Still Pays After Admission

Security beats a claim. A promise from a company in insolvency is worth its dividend under a resolution plan; a payment obligation owed by a solvent third party is worth its face value. That gap is the whole of this section.


Why an on-demand instrument beats a conditional one

Section 14(3)(b) of the Code places a surety in a contract of guarantee to a corporate debtor outside the moratorium, and appellate authority has treated irrevocable and unconditional bank guarantees as encashable while a moratorium runs. Whether that protection is available turns entirely on wording. A guarantee requiring the beneficiary to establish breach, quantify loss, or produce a determination before the bank pays is not an on-demand instrument, and a bank asked to pay on it against a debtor in insolvency will decline.


Draft for payment against a written demand stating that the sum claimed is due, without proof of default; waive expressly any requirement to proceed first against the vendor; and build in automatic extension, or a right to call the full amount if the instrument is not extended, so that an expiry date does not become a silent forfeiture. The clarification to section 14 made by the Insolvency and Bankruptcy Code (Amendment) Act, 2026, in force since 26 May 2026, concerns proceedings brought by a surety against the corporate debtor and leaves a beneficiary's right to call an independent instrument untouched.


Prepayments, deposits and guarantees from the group

Money paid in advance to a vendor later admitted becomes an operational creditor claim, and the buyer joins a queue. Structure terms so that a vendor above the exposure threshold never holds a net prepayment, or take an advance payment guarantee for the full prepaid sum. A parent guarantee is worth the guarantor's balance sheet and nothing more, which is why it should carry financial covenants on the guarantor and notice of any change in the guarantor's ownership.


A Drafting Map: What Each Protection Is Worth After Admission

The table below assumes an Indian counterparty, a CIRP admitted under section 7 or section 9, and a resolution professional running the business as a going concern.


Protection

How to draft it

How it fares once CIRP starts

Termination for insolvency

Precise trigger definition; retain for distress events outside a CIRP

Liable to be restrained where termination would destroy the business

Information covenants

Audited accounts, half-yearly management accounts, director's certificate

Already spent; the entire value is pre-admission warning

Credit event notification

Three business days, closed list, suspension and security call attached

Spent, but the disclosure record supports a later damages claim

On-demand bank guarantee

Payment against written demand, no proof of breach, automatic extension

Encashable; section 14(3)(b) keeps the surety outside the moratorium

Parent or corporate guarantee

Financial covenants on the guarantor, notice of ownership change

Enforceable, subject only to the guarantor's own solvency

Advances and deposits

No net prepayment above threshold; advance payment guarantee

An unsecured operational creditor claim absent an independent instrument

Buyer-owned tooling and title retention

Marking, segregation, bailment acknowledgement, removal on notice

Recovery barred while the property sits with the corporate debtor

Escrow of code, moulds and data

Tripartite deed, agent paid directly, licence granted at the outset

Release turns on whether the asset is treated as the debtor's property

Step-in and alternative sourcing

Second source qualified at onboarding, process licence, buffer stock

Practical rather than legal; depends on the resolution professional

Contractual set-off

Broad, cross-agreement, affiliate-wide right of set-off

Not available as insolvency set-off; pay in full and prove the claim

Exposure cap and payment cycle

System-enforced limit and a short interval between payment and delivery

The only protection that shrinks the size of the loss itself


Owning the Tooling Is Not the Same as Getting It Back

Buyers routinely leave moulds, dies, jigs, test fixtures, free issue materials and finished stock at a vendor's plant, protected by a clause recording that the items remain the buyer's property. The clause is correct and largely beside the point once the vendor is admitted, because section 14(1)(d) of the Code prohibits recovery of property by an owner where it is occupied by or in the possession of the corporate debtor.


What did Rajendra Bhutta settle about property in the debtor's hands?

In Rajendra K. Bhutta v. Maharashtra Housing and Area Development Authority [(2020) 13 SCC 208] a public authority sought to act on a termination notice and take back land the corporate debtor was developing under a joint development agreement. The Supreme Court held that section 14(1)(d) barred it, reading occupied by as wider than possession and covering actual physical use even where the corporate debtor held no proprietary interest. Applied to supply, the point is unforgiving: owning the mould does not entitle the buyer to send a truck for it once the moratorium runs, and the same bar defeats a supplier's retention of title clause over goods already delivered.


Draft for the period before that, the only period in which such a clause performs. Require segregated storage and permanent marking of buyer-owned assets, keep an asset register with serial numbers and photographs signed off by the vendor annually, take an acknowledgement that the vendor holds the items as bailee and asserts no lien, and reserve a right of removal on notice. Then use it. Property removed before admission is property saved.


Does escrow protect buyer assets during a vendor's CIRP?

Escrow works because it puts the asset outside the vendor's possession before distress arrives. A deposit held by a third-party agent, releasable on defined events including insolvency commencement, is enforceable against the agent, who is not the corporate debtor and not protected by the moratorium. The live question is whether the deposited material is property of the corporate debtor that the resolution professional may take into custody under section 18(1)(f) of the Code. Reduce that argument in the drafting: deposit a licensed copy rather than the only copy; grant the licence at the outset, exercisable on the release event; and pay the agent directly, so the arrangement does not lapse when a distressed vendor stops paying fees.



Continuity, Control and the Change of Control Nobody Can Veto


Can a buyer exercise step-in rights during a vendor's CIRP?

Step-in rights read well and perform badly. Nothing in a contract entitles a buyer to take over a vendor's plant once section 14 applies, and a resolution professional preserving the business as a going concern will resist any arrangement that moves value out of the estate. Preparation is what works: a second source qualified at onboarding, a licence of process documentation granted at the start, buffer stock of critical items held at the buyer's premises, and a right to duplicate tooling at the buyer's cost. None of that needs the vendor's cooperation on the day it fails.


Assignment, change of control and section 31

Most templates prohibit assignment without consent and give a termination right on a change of control. Neither is much use against a resolution plan. Approval under section 31 of the Code binds the corporate debtor, its creditors, employees, members and guarantors, and section 31(6), in force since 26 May 2026, extinguishes claims against the corporate debtor and its assets arising before approval. A change of control effected by a tribunal order is not a voluntary act the counterparty can price. Contract instead for notice of the change, confirmation from the incoming owner that performance continues on existing terms, and fresh credit support where the original guarantor leaves the group.



Set-off, Exposure and Getting to a Number Before the Tribunal Does


Set-off and netting inside a CIRP

A broad contractual set-off right, drawn to operate across every agreement between the parties and their affiliates, is worth having because it works completely outside insolvency. Inside a CIRP it does not. In Bharti Airtel Ltd. v. Vijaykumar V. Iyer [2024 INSC 15] the Supreme Court held that neither statutory nor insolvency set-off is available during a CIRP, since the resolution professional takes custody of the corporate debtor's assets under section 25 of the Code and set-off would prefer one creditor over the rest. Narrow room remains where the dealings form a single transaction.


Exposure caps and the payment cycle

These are commercial protections rather than legal ones, and the only measures here that reduce the size of the loss rather than the chance of recovery. Set a hard exposure limit per vendor, measured as advances plus buyer-owned property on site plus orders paid for and undelivered, and enforce it in the purchasing system rather than in a policy document. Shorten the interval between payment and delivery for watched vendors, and avoid running accounts that net across purchase orders, because invoice-level matching is what lets a claim be proved cleanly later.


Audit rights and a dispute clause built for speed

Reserve an annual right to inspect the vendor's premises and the records relating to buyer-owned property, exercisable through an independent auditor; those are the clauses that let a buyer prove ownership and quantum later. The dispute resolution clause should be designed for one objective, which is reaching a crystallised, quantified amount quickly. A sixty-day negotiation window followed by a thirty-day mediation window before arbitration can begin is a gift to a failing counterparty. Keep the tiers short with defined start and end points, carve out interim relief and any claim for delivery up of buyer-owned property, and choose a seat where interim protection is available in days. An award or an admitted liability obtained before commencement is a different asset from an unliquidated damages claim afterwards.



Why the Termination Right Is the Weakest Item in the Contract

In Gujarat Urja Vikas Nigam Ltd. v. Amit Gupta [(2021) 7 SCC 209] the Supreme Court restrained termination of a power purchase agreement where the sole ground was the counterparty's insolvency and the contract was central to the corporate debtor's survival as a going concern. The practical consequence for a vendor contract is that an ipso facto termination right is not self-executing; exercising it invites an application before the National Company Law Tribunal (the NCLT) and, on unfavourable facts, an order restraining its exercise.


Two further features compress the window. Section 14(1)(a) of the Code stays proceedings against the corporate debtor from the date of admission, so a suit or arbitration commenced after that date goes nowhere. And since 26 May 2026, when the explanation inserted into section 7 by the Insolvency and Bankruptcy Code (Amendment) Act, 2026 came into force, an adjudicating authority satisfied of debt and default may no longer weigh intervening or attendant circumstances such as the counterparty's overall solvency. Admission has become quicker and more predictable. The interval between visible distress and an irreversible order is shorter than it was, so anything useful in a contract has to work before that order, or be structured to survive it.


A Defined Credit Event List With a Duty to Notify

The most valuable clause in this family is a duty to notify on the occurrence of listed credit events, within three business days. The list should cover a downgrade of any credit rating by one notch or more, a rating withdrawal, or migration to an issuer-not-cooperating grade; receipt of a demand notice under section 8 of the Code; the filing of an application under section 7, 9 or 10 by or against the counterparty; invocation of any guarantee given by or for it; classification of any facility as a special mention account or a non-performing asset; resignation of the statutory auditor; and, for a listed counterparty, any default disclosed under regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015.


Companies in trouble routinely breach notification covenants, and that is exactly where the clause earns its keep. Breach of a notification duty is a clean, provable event of default. It does not require the buyer to prove the underlying financial distress, only that a notice which should have arrived did not.


Where Romalpa Drafting Stops in Indian Insolvency

Clauses reserving title until payment in full, the romalpa family, are enforceable as a matter of contract and are supported by sections 19 to 25 of the Sale of Goods Act, 1930. They belong in every supply contract. Their ceiling appears the moment the goods sit on the corporate debtor's premises, because section 14(1)(d) of the Code prohibits the recovery of any property by an owner or lessor where that property is occupied by or in the possession of the corporate debtor. In Rajendra K. Bhutta v. Maharashtra Housing and Area Development Authority [(2020) 13 SCC 208] the Supreme Court read that clause broadly, holding that land over which the corporate debtor held development rights and on which it was physically present could not be taken back by the authority despite termination of the development agreement, since the provision speaks of occupation and not merely of formal possessory title, and the Code prevails by force of section 238.


Translated into a supply contract, a seller who reserved title but delivered into the buyer's warehouse before admission will very likely be told to prove in the CIRP rather than take the stock back. The clause still earns its place, because it works in the period before admission, when a seller can stop delivery and recover goods with cooperation, and because it materially strengthens the position on identified, segregated, unmixed stock. Draft for segregation, labelling and separate storage of unpaid goods, a right of entry and inspection, and an obligation to hold resale proceeds in a designated account. Then keep delivery records good enough to tie specific goods to specific unpaid invoices, because a retention of title clause that cannot be traced to identifiable goods is an argument, not a remedy.



Drafting the Dispute Clause So the Claim Crystallises First

A disputed claim is a claim a resolution professional can treat as contingent, admit at a nominal value, or reject outright. For a vendor contract the design objective is speed to a crystallised, undisputed sum. That points to specific choices: a mechanism by which invoices not disputed in writing within a short fixed period are deemed accepted; a certificate of amounts due signed by an agreed officer and expressed to be conclusive absent manifest error; interest on delayed payment stated as a rate rather than left to statute; and a dispute resolution clause built to reach a binding outcome quickly, whether by expert determination for technical disputes, emergency arbitrator provisions, or a sole arbitrator with a seat and institution chosen for speed.


Long escalation ladders, mediation windows and cooling-off periods have their uses, but each tier is time during which a counterparty's balance sheet deteriorates and the claim stays uncrystallised. Where a multi-tier clause is used, the tiers should be tightly time-bound and expressly disapplied for claims in debt.



Frequently Asked Questions


Is a termination for insolvency clause now pointless?

No, but rely on it for what it can do. After Gujarat Urja, a termination whose only ground is the commencement of insolvency can be restrained by the NCLT, particularly where the contract is central to the corporate debtor's survival. It remains useful for distress events outside a CIRP and as the definitional anchor for suspension, security call and notification rights.


Can you take your moulds and tooling back from a vendor in CIRP?

Not unilaterally. Section 14(1)(d) of the Code stops an owner recovering property occupied by or in the possession of the corporate debtor, and Rajendra K. Bhutta read that expression broadly. Your routes are an application to the NCLT or agreement with the resolution professional, who may cooperate where the items have no value to the estate. The reliable answer is to remove the property while the vendor is still solvent.


Will a bank guarantee be honoured after the vendor is admitted?

An irrevocable and unconditional guarantee should be, because section 14(3)(b) keeps a surety in a contract of guarantee outside the moratorium. A conditional instrument, or one requiring you to prove breach first, is likely to be resisted by the bank. Check the wording of every instrument in your portfolio now rather than at the point of call, and watch expiry dates on instruments issued for distressed vendors.


Can amounts you owe the vendor be set off against your claim?

Not as insolvency set-off during the CIRP. Bharti Airtel holds that set-off would prefer you over other creditors once the resolution professional has custody of the assets. You pay what you owe and prove for what you are owed, unless you can establish that the dealings form a single transaction or that equitable set-off applies on the facts.


Does a change of control under a resolution plan let you exit the contract?

In practice, no. A resolution plan approved under section 31 binds all stakeholders and section 31(6) extinguishes prior claims. A consent right over assignment or change of control gives you no veto over a transfer effected by tribunal order. Negotiate instead for notification, confirmation of continued performance from the incoming owner, and replacement credit support.


Which single clause adds the most protection for the least negotiation?

The credit event notification duty, with a suspension and security call attached. It is cheap to agree at onboarding, healthy vendors do not resist it, and it converts a surprise into a period of warning during which every other remedy remains available. Covenants without a consequence attached are worth less; the consequence is what makes the vendor pick up the telephone.


Has the 2026 Amendment changed how much warning time a counterparty has?

Yes, and in the wrong direction for a creditor who is not paying attention. The explanation added to section 7, in force since 26 May 2026, prevents the adjudicating authority from weighing intervening circumstances once debt and default are established, and the Amendment sets fixed periods for admission orders. Distress converts into an admitted CIRP faster than it used to, which raises the value of every clause that gives you information or security before that point.


What credit events should trigger a mandatory notification duty in a vendor contract?

A well-drafted notification duty should list a downgrade or withdrawal of any credit rating, receipt of a demand notice under section 8 of the Insolvency and Bankruptcy Code, 2016, the filing of an application under section 7, 9 or 10, an application under section 95 against a guaranteeing promoter, creation of a new charge over the vendor's assets, default under a financing document, resignation of the statutory auditor, and dishonour of any instrument above a stated value, each reportable within a short fixed period such as three business days.


Why is a parent company guarantee weaker protection than an on-demand bank guarantee?

A parent or corporate guarantee is only as strong as the guarantor's own balance sheet and remains subject to the guarantor's own solvency, whereas an irrevocable and unconditional bank guarantee is generally treated as encashable during a vendor's moratorium because section 14(3)(b) of the Code places a surety in a contract of guarantee outside the protection extended to the corporate debtor. A parent guarantee should therefore carry its own financial covenants and require notice of any change in the guarantor's ownership.


What happens to advance payments made to a vendor that later enters CIRP?

A prepayment made to a vendor that is later admitted into CIRP becomes an unsecured operational creditor claim in the insolvency process rather than a recoverable sum, placing the buyer in the queue with other creditors. The practical protection is to avoid holding a net prepayment above an agreed exposure threshold, or to require an advance payment guarantee that covers the full prepaid amount from an independent third party.


Can retention of title over delivered goods be enforced once a vendor's CIRP begins?

Retention of title clauses, supported by sections 19 to 25 of the Sale of Goods Act, 1930, remain enforceable only up to the point the goods reach the corporate debtor's premises. Once there, section 14(1)(d) of the Insolvency and Bankruptcy Code, 2016 prevents an owner recovering property occupied by or in the possession of the corporate debtor, so the clause is effective mainly in the window before delivery, when stopping delivery or negotiating return with a solvent vendor is still possible.


Does a resolution plan approved under section 31 bind a buyer who objected to it?

Yes. Approval under section 31 of the Insolvency and Bankruptcy Code, 2016 binds the corporate debtor, its creditors, employees, members and guarantors, regardless of whether a particular stakeholder participated in or agreed with the resolution process. A buyer's consent right over assignment or change of control in its own contract does not operate as a veto against a change of control effected through an approved resolution plan.


What role does the payment cycle play in limiting exposure to a vendor's insolvency?

Shortening the interval between payment and delivery for a watched vendor, and avoiding netting arrangements that run across multiple purchase orders, reduces the value at risk if the vendor is admitted into CIRP and makes it easier to match specific payments to specific deliveries when proving a claim. Unlike contractual protections that depend on enforceability during CIRP, a tightened payment cycle and a hard exposure cap reduce the size of the potential loss itself.


Vikrant D. Shetty | Vikrant D. Shetty leads the Corporate and Commercial Law Practice and the Insolvency and Arbitration Practice at the law firm Vikrant D. Shetty & Associates, Advocates & Solicitors, advising Indian and international clients on supply and services contracts, credit support instruments and security packages, and acting for financial and operational creditors and corporate debtors before the National Company Law Tribunal (NCLT), Mumbai Bench, and the Bombay High Court.



This article is for general informational purposes only and does not constitute legal advice. For advice specific to your situation, please seek direct consultation with an advocate.

Comments